Big Swan Lake Phosphorus Reduction Plan by consultant Steve Henry

The attached technical calculations reflect results of lake water quality sampling done by consultant Steve Henry during the last year. They outline proposed Alum treatment areas on Big Swan, current mass of releasable phosphorus in those areas, expected reductions from the alum treatment and how those reductions line up with the TMD prescribed reductions to achieve the water quality goals for Big Swan Lake.

BigSwan_RMB P-fractions_Conversion to Volume

TMDLReductions

Area2

Area1Portrait

Posted in News.